1970: Difference between revisions

From The Bristol Railway Archive
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
== January ==  
== January ==  
5th. [[St Annes Park]] station closed.
5th. [[St Annes Park]] station closed.
== May ==
== May ==
Original footbridge at [[Keynsham]] station was dismantled and sold to the [[w:South_Devon_Railway_Trust|South Devon Railway]] where it was later re-erected at [[w:Buckfastleigh_railway_station|Buckfastleigh]].
Original footbridge at [[Keynsham]] station was dismantled and sold to the [[w:South_Devon_Railway_Trust|South Devon Railway]] where it was later re-erected at [[w:Buckfastleigh_railway_station|Buckfastleigh]].
== October ==
19th. [[:Category:The Severn Beach Line|The Severn Beach Line]] singled throughout, except for a passing loop at [[Clifton Down]].
== exact date not known ==
== exact date not known ==
[[Severn Railway Bridge]] [http://www.movietone.com/assets/BMN0627/quicktime/BMN_92745_32.mov demolished].
[[Severn Railway Bridge]] [http://www.movietone.com/assets/BMN0627/quicktime/BMN_92745_32.mov demolished].


[[Category:Timeline]]
[[Category:Timeline]]

Revision as of 19:11, 28 December 2007

January

5th. St Annes Park station closed.

May

Original footbridge at Keynsham station was dismantled and sold to the South Devon Railway where it was later re-erected at Buckfastleigh.

October

19th. The Severn Beach Line singled throughout, except for a passing loop at Clifton Down.

exact date not known

Severn Railway Bridge demolished.