1968: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
| Line 1: | Line 1: | ||
== January == | == January == | ||
21st. Elevated signal box at [[Bath Spa]] closed. | 21st. Elevated signal box at [[Bath Spa]] closed. | ||
== May == | == May == | ||
5th. [[Weston (Bath)]] signal box closed.<br> | 5th. [[Weston (Bath)]] signal box closed.<br> | ||
6th. Pilning High Level station name reverts to [[Pilning]].<br> | 6th. Pilning High Level station name reverts to [[Pilning]].<br> | ||
12th. [[Fishponds|Fishponds Signal Box]] closed. | 12th. [[Fishponds|Fishponds Signal Box]] closed.<br> | ||
[[ | [[Clevedon]] station site demolished. | ||
== June == | == June == | ||
3rd. [[Badminton]] station closed to passengers. | 3rd. [[Badminton]] station closed to passengers. | ||
== July == | == July == | ||
The [[Severn Beach]] to [[Pilning]] line closed. | The [[Severn Beach]] to [[Pilning]] line closed. | ||
== October == | == October == | ||
14th. [[Coaley|Coaley Junction]] signal box closed.<br> | 14th. [[Coaley|Coaley Junction]] signal box closed.<br> | ||
14th. [[Patchway]] station became unstaffed. | 14th. [[Patchway]] station became unstaffed. | ||
[[Category:Timeline]] | [[Category:Timeline]] | ||
Revision as of 15:31, 9 February 2008
January
21st. Elevated signal box at Bath Spa closed.
May
5th. Weston (Bath) signal box closed.
6th. Pilning High Level station name reverts to Pilning.
12th. Fishponds Signal Box closed.
Clevedon station site demolished.
June
3rd. Badminton station closed to passengers.
July
The Severn Beach to Pilning line closed.
October
14th. Coaley Junction signal box closed.
14th. Patchway station became unstaffed.