1970: Difference between revisions

From The Bristol Railway Archive
Jump to navigation Jump to search
Line 6: Line 6:


== October ==
== October ==
19th. [[Ashley Hill]] signal box closed.<br>
19th. [[:Category:The Severn Beach Line|The Severn Beach Line]] singled throughout, except for a passing loop at [[Clifton Down]].
19th. [[:Category:The Severn Beach Line|The Severn Beach Line]] singled throughout, except for a passing loop at [[Clifton Down]].



Revision as of 01:02, 10 January 2008

January

5th. St Annes Park station closed.

May

Original footbridge at Keynsham station was dismantled and sold to the South Devon Railway where it was later re-erected at Buckfastleigh.

October

19th. Ashley Hill signal box closed.
19th. The Severn Beach Line singled throughout, except for a passing loop at Clifton Down.

exact date not known

Severn Railway Bridge demolished.
Bristol East Power Box closed.