1968: Difference between revisions

From The Bristol Railway Archive
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
== January ==
== January ==
21st. Elevated signal box at [[Bath Spa]] closed.
21st. Elevated signal box at [[Bath Spa]] closed.
== May ==
== May ==
5th. [[Weston (Bath)]] signal box closed.
5th. [[Weston (Bath)]] signal box closed.
 
== October ==
14th. [[Coaley|Coaley Junction]] signal box closed.
[[Category:Timeline]]
[[Category:Timeline]]

Revision as of 23:06, 8 November 2007

January

21st. Elevated signal box at Bath Spa closed.

May

5th. Weston (Bath) signal box closed.

October

14th. Coaley Junction signal box closed.