Severn Tunnel Construction Line: Difference between revisions

From Bristol Railway Archive
Jump to navigation Jump to search
New page: <div style="float:right"> <googlemap lat="51.571575" lon="-2.661781"> 51.573782, -2.658734, Junction with New Passage Pier Line 51.573689, -2.659603 51.573429, -2.660515 51.572689, -2.6627...
 
No edit summary
Line 2: Line 2:
<googlemap lat="51.571575" lon="-2.661781">
<googlemap lat="51.571575" lon="-2.661781">
51.573782, -2.658734, Junction with New Passage Pier Line
51.573782, -2.658734, Junction with New Passage Pier Line
51.573689, -2.659603
#758BC5
51.573429, -2.660515
51.573429, -2.660515
51.572689, -2.662715
51.572689, -2.662715

Revision as of 14:29, 9 April 2008

<googlemap lat="51.571575" lon="-2.661781"> 51.573782, -2.658734, Junction with New Passage Pier Line

  1. 758BC5

51.573429, -2.660515 51.572689, -2.662715 51.572229, -2.66368 51.570948, -2.664324 51.570195, -2.664571 51.569094, -2.664678 51.568027, -2.66382 51.567574, -2.662683 51.567014, -2.660794 51.566133, -2.657747 </googlemap>

History

During the construction of the Severn Tunnel a line was constructed which ran from the New Passage Pier line to a shaft near the Pilning Portal of the Tunnel.