1917
Jump to navigation
Jump to search
March
10th. Hallen Halt reopened after closing in 1915.
April
2nd. Twerton-on-Avon station closed as a wartime measure.
29th. Hampton Row Halt closed.
May
Doubling of Filton to Avonmouth line completed.
14th. Hotwells Halt opened.
November
1st. Ashton Gate Platform closed as a wartime economy measure.
exact date not known
Line between Avonmouth and Filton doubled.
Hallen Marsh Junction signal box opens.