Henbury West
Jump to navigation
Jump to search
To Filton: Blaise Signal Box and Sidings
To Avonmouth: M5
History
This was a temporary signal box put in place during the doubling of the Filton - Hallen Marsh Junction section of track, and the construction of bridges across two motorways.
Gallery
-
The double track section from Filton ends at the temporary box while construction of the motorway bridges takes place. © Mike Radford
-
A Class 59 powers north with a stone train. © Mike Radford
-
Some interior shots of the cabin. © Mike Radford
-
An overview of the work in progress. © Neil Higson