1886: Difference between revisions
Jump to navigation
Jump to search
New page: == exact date unknown == New Passage Pier closed with the opening of the Severn Tunnel. Category:Timeline |
No edit summary |
||
| (4 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
== | == May == | ||
[[New Passage Pier]] closed with the opening of the [[Severn Tunnel]]. | 29th. Bristol Loop Line (Rhubarb Loop) opens. | ||
== September == | |||
1st. [[Severn Tunnel]] opened to goods traffic. | |||
== October == | |||
1st. Steamer services from [[Bristol & Portishead Pier & Railway Station|Portishead Pier]] ceased. | |||
== December == | |||
1st. [[New Passage Pier]] closed with the opening of the [[Severn Tunnel]].<br> | |||
1st. [[Pilning]] station opened.<br> | |||
27th. Gatemen withdrawn from level crossing on Coalpit Heath branch. | |||
[[Category:Timeline]] | [[Category:Timeline]] | ||
Latest revision as of 22:16, 20 December 2009
May
29th. Bristol Loop Line (Rhubarb Loop) opens.
September
1st. Severn Tunnel opened to goods traffic.
October
1st. Steamer services from Portishead Pier ceased.
December
1st. New Passage Pier closed with the opening of the Severn Tunnel.
1st. Pilning station opened.
27th. Gatemen withdrawn from level crossing on Coalpit Heath branch.