1886: Difference between revisions

From The Bristol Railway Archive
Jump to navigation Jump to search
New page: == exact date unknown == New Passage Pier closed with the opening of the Severn Tunnel. Category:Timeline
 
No edit summary
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
== exact date unknown ==
== May ==
[[New Passage Pier]] closed with the opening of the [[Severn Tunnel]].
29th. Bristol Loop Line (Rhubarb Loop) opens.
== September ==
1st. [[Severn Tunnel]] opened to goods traffic.
== October ==
1st. Steamer services from [[Bristol & Portishead Pier & Railway Station|Portishead Pier]] ceased.
== December ==
1st. [[New Passage Pier]] closed with the opening of the [[Severn Tunnel]].<br>
1st. [[Pilning]] station opened.<br>
27th. Gatemen withdrawn from level crossing on Coalpit Heath branch.
[[Category:Timeline]]
[[Category:Timeline]]

Latest revision as of 22:16, 20 December 2009

May

29th. Bristol Loop Line (Rhubarb Loop) opens.

September

1st. Severn Tunnel opened to goods traffic.

October

1st. Steamer services from Portishead Pier ceased.

December

1st. New Passage Pier closed with the opening of the Severn Tunnel.
1st. Pilning station opened.
27th. Gatemen withdrawn from level crossing on Coalpit Heath branch.