1886
Jump to navigation
Jump to search
May
29th. Bristol Loop Line (Rhubarb Loop) opens.
September
1st. Severn Tunnel opened to goods traffic.
October
1st. Steamer services from Portishead Pier ceased.
December
1st. New Passage Pier closed with the opening of the Severn Tunnel.
1st. Pilning station opened.
27th. Gatemen withdrawn from level crossing on Coalpit Heath branch.