1886: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
== May == | |||
29th. Bristol Loop Line (Rhubarb Loop) opens. | |||
== September == | == September == | ||
1st. [[Severn Tunnel]] opened to goods traffic. | 1st. [[Severn Tunnel]] opened to goods traffic. | ||
| Line 5: | Line 7: | ||
== December == | == December == | ||
1st. [[New Passage Pier]] closed with the opening of the [[Severn Tunnel]].<br> | 1st. [[New Passage Pier]] closed with the opening of the [[Severn Tunnel]].<br> | ||
1st. [[Pilning]] station opened. | 1st. [[Pilning]] station opened.<br> | ||
27th. Gatemen withdrawn from level crossing on Coalpit Heath branch. | |||
[[Category:Timeline]] | [[Category:Timeline]] | ||
Latest revision as of 22:16, 20 December 2009
May
29th. Bristol Loop Line (Rhubarb Loop) opens.
September
1st. Severn Tunnel opened to goods traffic.
October
1st. Steamer services from Portishead Pier ceased.
December
1st. New Passage Pier closed with the opening of the Severn Tunnel.
1st. Pilning station opened.
27th. Gatemen withdrawn from level crossing on Coalpit Heath branch.