This Way to the Forums! Join in and Post :)
And an Archive of the earlier Forum! This one is read only but brilliant stuff!
1928
Jump to navigation
Jump to search
Portbury Shipyard Loop and signal box reopened.
July
9th. Through services between Avonmouth and Pilning commenced.
9th. Cross Hands Halt opened.
9th. New Passage Halt opened.
9th. Nightingale Valley Halt opened
9th. Pilning Low Level station opened.
9th. Pilning renamed Pilning High Level.
August
Ashton Gate Platform renamed Ashton Gate.
October
13th. The Charfield railway disaster takes place.