This Way to the Forums! Join in and Post  :)

And an Archive of the earlier Forum! This one is read only but brilliant stuff!

1988

From Bristol Railway Archive
Jump to navigation Jump to search

January

25th. Avonmouth Town Goods signal box closed.
25th. Hallen Marsh Junction signal box closed. 25th. Holesmouth Junction signal box closed.
25th. Satellite signal panel installed at St Andrews Junction signal box.

July

Radstock Wagon Works closed.

No Actual Date

Freshford station platforms lowered as part of a realignment of track through the station which allowed trains to pass at a faster speed.